• 79°

Oregon Inlet Fishing Center to undergo upgrade

Cape Hatteras National Seashore staffers are now working with the National Park Service lessee at Oregon Inlet Fishing Center, Oregon Inlet Marinas, LLC, to develop strategies to replace vulnerable structures and conduct site improvements at the marina. Members of the public are invited to provide comments.

Oregon Inlet Marina is located at 98 NC 12, Nags Head in the Bodie Island district of Cape Hatteras National Seashore. The marina is just north of the new Marc Basnight Oregon Inlet Bridge. The marina includes a 60-slip marina, seven buildings, about 7.4 acres of upland and submerged land, parking lots and fuel system for vessels and vehicles. The marina is adjacent to the National Park Service public boat ramp and U.S. Coast Guard Station Oregon Inlet.

Oregon Inlet Fishing Center is managed by Oregon Inlet Marinas, LLC under a 20-year lease with the National Park Service (2018-2038). In general, the fishing center provides marina slip rentals for charter fishing boats, headboats, and tour boats; booking services for charter fishing and other boats; retail sales as well as food and beverage sales. The fishing center is also authorized to provide non-motorized watercraft rentals (such as kayaks and canoes); special events, such as fishing tournaments; and a children’s play area.

The marina facilities and premises that support these services have not been substantially improved or updated in decades, according to NPS. The National Park Service and Oregon Inlet Marinas, LLC, seek to replace the existing, deteriorating structures with modern, sustainable buildings that are adapted to sea level rise and storm surge, as well as make additional improvements to the premises.

The key issues are:

– The main marina building was constructed 1963-1964 and all of the buildings within the marina are in poor condition and vulnerable to storm surge and sea level rise.

– The location of the marine fuel docks causes traffic congestion and safety hazards.

– The existing improved parking areas are inadequate to meet customer, visitor and employee needs.

Three draft strategies are presented in a media release:

– Replace buildings with sustainable, energy-efficient and elevated buildings.

– Replace existing marine fuel pumps with in-slip fueling and a transient fuel dock.

– Formalize overflow parking area.

The timeline for the projects indicates that planning and environmental planning will take place until fall 2020. Construction and improvement projects would start in fall 2020. Construction and improvement projects would be complete in early 2022.

Submit comments to parkplanning.nps.gov/oregon_inlet_fishingcenter by Jan. 10, 2020. Two questions posed: are there other actions beside those listed to consider and what suggestions could address the key issues.

READ MORE IN OUR ON THE WATER SECTION HERE.

RECENT HEADLINES:

Recreational slot limit implemented for striped bass caught in the ocean

Public asked to report cold stunned spotted seatrout

Hyde

Second COVID-19 case reported in Hyde County

News

Trump won’t be in Charlotte, but RNC may still hold events

News

Bill earmarks $300M more COVID-19 funds for N.C. government

Lifestyles

Scuppernong River Festival canceled for this year

Lifestyles

Weekly Devotion – John 6:1-2

News

Additional COVID-19 case reported in Dare; total now 23

NEWSLETTER News

NC Oyster Trail accepting membership applications

News

Dare sets second COVID-19 drive-through testing event

Lifestyles

Red Cross blood drives set for June

Schools

Devan Rodman named to Dean’s List at University of the Sciences

NEWSLETTER Opinion

Social Security Matters: Ask Rusty – Are Social Security and Medicare running out of money?

News

Two indicted for bilking $13M from North Carolina Medicaid

News

First Flight High School seniors take the stage for graduation

News

‘Drive-in’ graduations approved for DCS, traditional ceremonies considered for July

Columnist

You Decide: Can we have both health and wealth?

News

Manteo sets public hearing on budget

News

Tyrrell County Schools employee tests positive for COVID-19; campuses closed for cleaning

News

Dangerous Animal Appeal Board upholds determination on two Nags Head dogs

Currituck

Currituck Planning Board recommends fire protection changes

News

High rip current risk for many Outer Banks beach areas; moderate risk for Currituck and south of Cape Hatteras

News

Many states scrambling to update hurricane plans for virus

News

Protesters in some cities target Confederate monuments

News

Police use tear gas to disperse Raleigh protesters

Sports

Stenhouse heads to Bristol buoyed by good run at Charlotte